15.2.2023
Vroom Funderingstechnieken is piling at the project of Kwadijkerpark Phase one deep foundations for 67 homes in Purmerend, the Netherlands. For the piling, they are using their Junttan PMx25 pile driving rig. The piling job includes several different sizes of square concrete piles; 220, 250, 290, 320, and 350 mm, with lengths from 6,75 up to 24 meters.
Kwadijkerpark is a natural and socially orientated living area in the middle of the existing park. Surrounded by big trees and lovely waterways there will be built a different kinds of sustainable and architecturally beautiful houses.
Read more about the Kwadijkerpark project HERE.
And learn more on Junttan PMx25 pile driving rig.
// Photos and Dutch text by Jerry Mast, Vroom Funderingstechnieken:
Voor het project 67 woningen Kwadijkerpark Fase 1 in Purmerend (NH) heien wij de Prefab heipalen (beton) en leveren en monteren wij de Prefab funderingsbalken.
Prefabbetonpalen vierkant 220, 250,290,320 en 350
Met een lengte van 6,75m tot 24,00m
Kwadijkerpark
Een natuurrijke en sociaal georiënteerde wijk, midden in het bestaande park. Te midden van volwassen bomen en prachtige waterpartijen komen duurzame en architectonisch fraaie huizen, waaronder twee-onder-een-kapwoningen, future living woningen en eengezinswoningen
https://kwadijkerpark.nl/nl/


Roger Bullivant Limited, part of the VINCI Group, commenced the hire of the Junttan DR5 in June, with the rig...
9.7.2026
Menard USA has become the first contractor in the United States to put Junttan’s new DR5 drilling rig into production,...
9.7.2026
As we move through another busy period across Australia and New Zealand, we’d like to share some highlights from the...
23.6.2026
We are proud to publish our Anniversary book – 50 Years of Junttan ✨ As we celebrate our 50th anniversary,...
22.6.2026