15.2.2023
Vroom Funderingstechnieken is piling at the project of Kwadijkerpark Phase one deep foundations for 67 homes in Purmerend, the Netherlands. For the piling, they are using their Junttan PMx25 pile driving rig. The piling job includes several different sizes of square concrete piles; 220, 250, 290, 320, and 350 mm, with lengths from 6,75 up to 24 meters.
Kwadijkerpark is a natural and socially orientated living area in the middle of the existing park. Surrounded by big trees and lovely waterways there will be built a different kinds of sustainable and architecturally beautiful houses.
Read more about the Kwadijkerpark project HERE.
And learn more on Junttan PMx25 pile driving rig.
// Photos and Dutch text by Jerry Mast, Vroom Funderingstechnieken:
Voor het project 67 woningen Kwadijkerpark Fase 1 in Purmerend (NH) heien wij de Prefab heipalen (beton) en leveren en monteren wij de Prefab funderingsbalken.
Prefabbetonpalen vierkant 220, 250,290,320 en 350
Met een lengte van 6,75m tot 24,00m
Kwadijkerpark
Een natuurrijke en sociaal georiënteerde wijk, midden in het bestaande park. Te midden van volwassen bomen en prachtige waterpartijen komen duurzame en architectonisch fraaie huizen, waaronder twee-onder-een-kapwoningen, future living woningen en eengezinswoningen
https://kwadijkerpark.nl/nl/
October 25th, 2023, Kuopio, Finland Leica Geosystems and Junttan Oy join forces to revolutionize the way piling professionals operate, enhancing...
25.10.2023
We are continuously seeking new innovative solutions and are pleased to introduce our Drivability Analysis service, designed to take your...
17.10.2023
The year 2023 has brought many new and exciting firsts for Junttan B.V. so far. We have been fortunate to...
17.10.2023
Junttan hosted its history’s first Foundation Day (Pohjarakennuspäivä) seminar on October 5th in Kuopio, Finland. The event was a success...
9.10.2023