15.2.2023
Vroom Funderingstechnieken is piling at the project of Kwadijkerpark Phase one deep foundations for 67 homes in Purmerend, the Netherlands. For the piling, they are using their Junttan PMx25 pile driving rig. The piling job includes several different sizes of square concrete piles; 220, 250, 290, 320, and 350 mm, with lengths from 6,75 up to 24 meters.
Kwadijkerpark is a natural and socially orientated living area in the middle of the existing park. Surrounded by big trees and lovely waterways there will be built a different kinds of sustainable and architecturally beautiful houses.
Read more about the Kwadijkerpark project HERE.
And learn more on Junttan PMx25 pile driving rig.
// Photos and Dutch text by Jerry Mast, Vroom Funderingstechnieken:
Voor het project 67 woningen Kwadijkerpark Fase 1 in Purmerend (NH) heien wij de Prefab heipalen (beton) en leveren en monteren wij de Prefab funderingsbalken.
Prefabbetonpalen vierkant 220, 250,290,320 en 350
Met een lengte van 6,75m tot 24,00m
Kwadijkerpark
Een natuurrijke en sociaal georiënteerde wijk, midden in het bestaande park. Te midden van volwassen bomen en prachtige waterpartijen komen duurzame en architectonisch fraaie huizen, waaronder twee-onder-een-kapwoningen, future living woningen en eengezinswoningen
https://kwadijkerpark.nl/nl/
Our rental fleet continues to change and grow, with more HHx hammers sailing to Australia, by supply from Finland. There...
28.3.2023
Conexpo 2023 is in the rearview mirror! Junttan is pleased to announce the show was a complete and total success....
27.3.2023
At the end of last year, we launched a new light spare parts agreement model, JunttanCare+, to respond to those...
27.3.2023
Vroom Funderingstechnieken is piling at the project of Kwadijkerpark Phase one deep foundations for 67 homes in Purmerend, the Netherlands....
15.2.2023