2.12.2019
Junttan supports customer’s Junttan equipment no matter are their old or new, or have they been purchased from Junttan or somewhere else.
Here Junttan Pty Ltd’s Technical Support Manager, Chris Symons, commissioning an used Junttan HHK25S with 30CCU power pack for PT. Cemerlang Samudra Kontrindo in Balikpapan, Indonesia. The Junttan hammer was the company’s return to hydraulic impact hammer because of the demand from the project owner. The hammer will be used to pile 130 number of steel piles, dia. 1 500 mm and length of 48 m in flare relocation project. The oil refinery’s flare will be relocated further out to sea from its current position. We wish PT. CSK happy pilling with their Junttan hammer.
The Swan River Crossings Project is making strong progress in Perth, Australia. This major infrastructure upgrade will replace the aging...
26.3.2025
Step Into the Operator’s Seat – Junttan Simulator at Bauma 2025! Think you’ve got what it takes to be a...
25.3.2025
Dear Junttan Friend, We are delighted to invite you to Bauma 2025, the world’s leading trade fair for construction machinery,...
25.3.2025
Junttan’s success in the UK and Ireland has been built on a solid foundation of renowned pile driving rigs, coupled...
24.3.2025