15.11.2016

P14 Cimentaciones working with Junttan rigs at the New Amazon Logistic Warehouse in Barcelona, Spain on September 2016.
Junttan client P14 Cimentaciones from Valencia, Spain won the piling contract for the New Amazon Logistic Warehouse in Barcelona, Spain. The Logistics Centre project is estimated to be finished by autumn 2017. The whole contract was managed by Dragados SA. The warehouse resides in a land of 150,808 sq. and will offer jobs for 1,500 by the year 2020.
P14 Cimentaciones finished successfully the piling work of 2400 pcs of concrete piles. The piles were 400×400 mm on diameter and 40 – 42 meters of length. P14 Cimentaciones used Junttan rigs PMx22 and PM20LC for this project. Junttan HHK 5/7A hydraulic hammers were used for pile driving. P14 Cimentaciones finished the piling work on time. Most importantly the main contractor, Dragados SA was able to continue the project on schedule.
P14 Cimentaciones has been extremely happy with the productivity and reliability of Junttan rigs. An important efficiency factor has been the low fuel consumption of Junttan machinery during the project.
Want to know more about Junttan in Spain? Contact Miika Eskelinen, miika.eskelinen@junttan.com or Bruno Perez, bruno.perez@junttan.com
Source:
http://www.auraree.com/real-estate-news/amazon-will-invest-e200m-in-its-centre-in-barcelona/
An important infrastructure project, demanding drilling work and one shared goal: keeping our customer Dewatering & Silent Piling S.R.L.’s Junttan...
21.10.2026
Three cities, multiple job sites, and one shared goal: keeping our valued customer P14 Cimentaciones’ Junttan equipment performing safely and...
7.10.2026
The Junttan Noise Silencer Kit is increasingly being used on jobsites where reducing noise levels during piling operations is essential...
30.9.2026
Junttan has been awarded the Kunnian Kukko Internationalization Award by the Kuopio Region Chamber of Commerce in recognition of the...
4.9.2026