15.11.2016
P14 Cimentaciones working with Junttan rigs at the New Amazon Logistic Warehouse in Barcelona, Spain on September 2016.
Junttan client P14 Cimentaciones from Valencia, Spain won the piling contract for the New Amazon Logistic Warehouse in Barcelona, Spain. The Logistics Centre project is estimated to be finished by autumn 2017. The whole contract was managed by Dragados SA. The warehouse resides in a land of 150,808 sq. and will offer jobs for 1,500 by the year 2020.
P14 Cimentaciones finished successfully the piling work of 2400 pcs of concrete piles. The piles were 400×400 mm on diameter and 40 – 42 meters of length. P14 Cimentaciones used Junttan rigs PMx22 and PM20LC for this project. Junttan HHK 5/7A hydraulic hammers were used for pile driving. P14 Cimentaciones finished the piling work on time. Most importantly the main contractor, Dragados SA was able to continue the project on schedule.
P14 Cimentaciones has been extremely happy with the productivity and reliability of Junttan rigs. An important efficiency factor has been the low fuel consumption of Junttan machinery during the project.
Want to know more about Junttan in Spain? Contact Miika Eskelinen, miika.eskelinen@junttan.com or Bruno Perez, bruno.perez@junttan.com
Source:
http://www.auraree.com/real-estate-news/amazon-will-invest-e200m-in-its-centre-in-barcelona/
The municipality of Nortorf in Schleswig-Holstein, northern Germany is getting some of the most powerful wind turbines worldwide which will...
20.6.2022
First, we would like to thank you all who visited us at the opening party of our new facility in...
18.6.2022
– Lue Suomeksi alta – At Junttan, the year 2022 has brought speed and fair winds for our Deep Foundation...
10.6.2022
During the past year, Pålab acquired two new Junttan pile driving rigs, PM23LC and PMx22, both equipped with HHK3/4/5A hammers....
3.6.2022