22.2.2017
Aarsleff Ground Engineering UK:
Aarsleff Ground Engineering’s head office now proudly overlooks the wind farm in Hawton, Newark, where they installed the foundations for the three turbines. Aarsleff installed 54 open-ended steel tubes for each of the three turbines, with pile lengths ranging from 18 metres to 24 metres. The work was carried out in July 2016 with their Junttan PM20 rig, fitted with a five-tonne accelerated hammer.
To download Aarsleff’s Wind Farm brochure, click the link: https://lnkd.in/dS8YKpG
At Junttan Canada, we are proud to provide world-class piling equipment and expert technical support to construction and foundation professionals...
23.6.2025
Junttan UK is proud to announce our new role as sponsor and member of the Steel Piling Group. With the...
18.6.2025
We are thrilled to share that our recent customer survey resulted in a record-high Net Promoter Score (NPS) of 71...
5.5.2025
We are happy to inform that Junttan Oy and Innovative Infra & Mining Solutions Ltd. (IIMS) have signed a dealership...
30.4.2025