7.5.2021
Beautiful pictures of Heibedrijf Van Dam working on two different jobsites at the end of last year. In the first picture they were using a Junttan PMx22 pile driving rig to install concrete piles in a bridge project, the replacement of Schoenriemsebrug in Almkerk, The Netherlands. In the second picture they were using the same Junttan rig to install 303 concrete piles in Kapelle, The Netherlands in the beautiful sunrise. Great work and thanks a lot for sharing!
We’re excited to share that Junttan has been actively collaborating with key industry players, including Liebherr, Bauer, and ABI, as...
15.11.2024
Piling operations will always carry certain risks, but with the right safety protocols in place, these can be effectively minimized....
13.11.2024
Our Australian team is going through busy times! We’re thrilled to share that we’re moving full steam ahead as demand...
11.11.2024
Introducing the Junttan HHx500 Hydraulic Impact Hammer! Bigger, bolder, and engineered for exceptional performance – the Junttan HHx500 is here...
7.11.2024