13.12.2019
Wagstaff Piling Pty Ltd’s new Junttan multipurpose MPx90 piling rig with driven piling setup (14 ton hammer configuration) at the first jobsite, Rockhampton to Gracemere duplication on the Capricorn Highway in Australia. They are driving 550 mm octagonal piles for a new bridge over Scrubby Creek, 5 piles per side, 25 m long for one side and 28 m long on the other side.
Wagstaff Piling is wholly Australian-owned enterprise, and operates throughout Australia with the most advanced piling equipment available. The Capricorn Highway Duplication project focuses on addressing the capacity of the highway between Rockhampton and Gracemere to cater for the traffic volumes that exceed 18,000 vehicles per day. The Capricorn Highway is a commuter route connecting the community of Gracemere to Rockhampton City. It also serves as a key freight route in Central Queensland connecting the Bruce Highway in the east to central and western Queensland. Completion of the project will be early 2021.
Ask further information on project: Wagstaff Piling
Furtner information on equipment:
Arteen Mosad, Junttan Pty Ltd
tel. +61 423 319 411
email arteen.mosad (at) junttan.com
The Swan River Crossings Project is making strong progress in Perth, Australia. This major infrastructure upgrade will replace the aging...
26.3.2025
Step Into the Operator’s Seat – Junttan Simulator at Bauma 2025! Think you’ve got what it takes to be a...
25.3.2025
Dear Junttan Friend, We are delighted to invite you to Bauma 2025, the world’s leading trade fair for construction machinery,...
25.3.2025
Junttan’s success in the UK and Ireland has been built on a solid foundation of renowned pile driving rigs, coupled...
24.3.2025