High-Performance Ground Improvement with the Junttan DR5 in Derbyshire, UK
Aarsleff Ground Engineering delivered a major programme of ground improvement works for a new industrial development in Derbyshire, UK, where a 645,000 sq ft speculative warehouse was being brought forward for development. The project included the installation of more than 9,000 rigid inclusions to improve ground performance and provide the required support for a large-scale warehouse platform.
For the piling works, Aarsleff utilized the Junttan DR5 drilling rig for full displacement piling. The scale of the project called for high productivity and consistent installation quality throughout the programme.
The DR5 provided the rotary torque, crowd force and high rotation speeds required for rapid and consistent installation. Its class-leading single-pass drilling performance further supported productivity across the high-volume piling works.
Customer Experience
The Junttan DR5 combined high drilling performance with smart technology designed to support both the operator and the piling process.
Its advanced chassis and operator-focused cabin design offer excellent visibility and integrate the latest monitoring technology, giving real-time feedback on drilling behavior and rig performance throughout the operation, says the Aarsleff team.
Overall, the Aarsleff team has been impressed with the DR5, describing it as a game-changer on this scheme. They highlight its power and control in full displacement piling, while the smart automation assistants and onboard diagnostics give operators continuous insight into rig performance, helping ensure optimal operation at every stage.
With more than 9,000 rigid inclusions installed, the Derbyshire project demonstrated the DR5’s capabilities in a demanding, high-production ground improvement application — combining drilling performance, operator-focused technology and efficiency on site.
See the Junttan DR5 in action
Watch our Project Spotlight video from the Derbyshire project and see how Aarsleff Ground Engineering utilized the DR5 on site.

Project Facts
Project type:
Commercial
Location:
Derbyshire, UK
Piling Contractor:
Aarsleff Ground Engineering
Piles:
More than 9,000 rigid inclusions installed using the Full Displacement Piling (FDP) method
Equipment:
Junttan DR5 drilling rig
Piling period:
H1 2026

The DR5 has been a game-changer on this scheme. Its power and control give us the precision we need for displacement piling, and the onboard diagnostics mean our operators can see exactly how the rig is performing at every stage. It’s a smart, efficient bit of kit that’s helping us deliver the programme with real confidence.
Aarsleff Team