15.2.2023
Vroom Funderingstechnieken is piling at the project of Kwadijkerpark Phase one deep foundations for 67 homes in Purmerend, the Netherlands. For the piling, they are using their Junttan PMx25 pile driving rig. The piling job includes several different sizes of square concrete piles; 220, 250, 290, 320, and 350 mm, with lengths from 6,75 up to 24 meters.
Kwadijkerpark is a natural and socially orientated living area in the middle of the existing park. Surrounded by big trees and lovely waterways there will be built a different kinds of sustainable and architecturally beautiful houses.
Read more about the Kwadijkerpark project HERE.
And learn more on Junttan PMx25 pile driving rig.
// Photos and Dutch text by Jerry Mast, Vroom Funderingstechnieken:
Voor het project 67 woningen Kwadijkerpark Fase 1 in Purmerend (NH) heien wij de Prefab heipalen (beton) en leveren en monteren wij de Prefab funderingsbalken.
Prefabbetonpalen vierkant 220, 250,290,320 en 350
Met een lengte van 6,75m tot 24,00m
Kwadijkerpark
Een natuurrijke en sociaal georiënteerde wijk, midden in het bestaande park. Te midden van volwassen bomen en prachtige waterpartijen komen duurzame en architectonisch fraaie huizen, waaronder twee-onder-een-kapwoningen, future living woningen en eengezinswoningen
https://kwadijkerpark.nl/nl/
The Swan River Crossings Project is making strong progress in Perth, Australia. This major infrastructure upgrade will replace the aging...
26.3.2025
Step Into the Operator’s Seat – Junttan Simulator at Bauma 2025! Think you’ve got what it takes to be a...
25.3.2025
Dear Junttan Friend, We are delighted to invite you to Bauma 2025, the world’s leading trade fair for construction machinery,...
25.3.2025
Junttan’s success in the UK and Ireland has been built on a solid foundation of renowned pile driving rigs, coupled...
24.3.2025