13.12.2018
Subsurface Construction, LLC renting a Junttan PMx28 from Hammer & Steel for the I-5 Port of Tacoma project. Subsurface is driving 900 timber piles in 25’ lengths in for ground improvement in Tacoma, WA USA. The project is a multi-phased plan to improve the Port of Tacoma Road/Interstate 5 interchange, Pacific Highway East and the Port of Tacoma Road.
The mountain in the back is, Mount Rainier, which is a stratovalcano, and is the largest mountain in Washington!
Learn more about the Junttan PMx28: https://junttan.com/products/pile-driving-rigs/
We’re excited to share that Junttan has been actively collaborating with key industry players, including Liebherr, Bauer, and ABI, as...
15.11.2024
Piling operations will always carry certain risks, but with the right safety protocols in place, these can be effectively minimized....
13.11.2024
Our Australian team is going through busy times! We’re thrilled to share that we’re moving full steam ahead as demand...
11.11.2024
Introducing the Junttan HHx500 Hydraulic Impact Hammer! Bigger, bolder, and engineered for exceptional performance – the Junttan HHx500 is here...
7.11.2024