13.12.2018
Subsurface Construction, LLC renting a Junttan PMx28 from Hammer & Steel for the I-5 Port of Tacoma project. Subsurface is driving 900 timber piles in 25’ lengths in for ground improvement in Tacoma, WA USA. The project is a multi-phased plan to improve the Port of Tacoma Road/Interstate 5 interchange, Pacific Highway East and the Port of Tacoma Road.
The mountain in the back is, Mount Rainier, which is a stratovalcano, and is the largest mountain in Washington!
Learn more about the Junttan PMx28: https://junttan.com/products/pile-driving-rigs/
Bauma 2025 is just two months away! The 34th edition of the world’s leading trade fair for construction machinery is...
5.2.2025
KUOPIO, FINLAND, 30th JANUARY 2025 Junttan, a global leader in pile driving equipment manufacturing, announces the launch of the new...
20.1.2025
We’re excited to share that Junttan has been actively collaborating with key industry players, including Liebherr, Bauer, and ABI, as...
15.11.2024
Piling operations will always carry certain risks, but with the right safety protocols in place, these can be effectively minimized....
13.11.2024