The PMx28 is Junttan’s biggest pile driving rig weighing around 95 000kg with telescopic leader for extremely efficient and more powerful heavy duty use. The rig has excellent stability and wide leader inclination angles. The recommended hammer size is from 5 000 to 12 000 kg and the maximum pile length is 28 meters (91 ft) with Junttan SHK110-5 tn hammer.
Average working weight:90 000 kg (198 000 lb)
Leader capacity:30 000 kg (66 100 lb)
Optimal hammer size:7/12 tons (15 400-26 400 lb)
Max pile length:28 m (91 ft)
Junttan PMx28 is a medium weight piling rig designed for driving steel and concrete piles. PMx28 is Junttan’s biggest pile driving rig with telescopic leader for extremely efficient and more powerful heavy duty use. The rig has excellent stability and wide leader inclination angles. The recommended hammer size is from 5 000 to 9 000 kg and the maximum pile length is 28 meters (91 ft) with Junttan SHK110-5 hammer. The rig has proven productivity and the telescopic leader ensures easy and fast handling of piles. Top pile driving performance is guaranteed with Junttan hydraulic hammers. An optional side drill makes pile driving even more efficient in some soil conditions. With optional Junttan equipment, optimised working set-up of the rig can be easily achieved.
This Junttan piling rig has all proven features of Junttan X-series and it comprises a number of new technologies to minimize the fuel consumption and environmental impact. Its rugged design makes it a safe and reliable rig even in the most demanding working conditions. The selferecting leader and many advanced technical features ensure that the rig is ready to work in just a few minutes. The ergonomic and safety tested cabin allows the driver to concentrate completely on his work. The expandable tracks and low center of gravity make the rig exceptionally stable in different working situations. The horizontal movement of the leader and a full 360 degree working radius ensures fast spotting of the pile. In spite of larger size the rig can be still easily transported to a new working site.
Minimum track width.
PMx28 transport dimensions with longest available leader configuration (Hydraulic Impact Hammer HHK 5SL). Leader hinge is optional.
Minimum track width.
PMx28 transport dimensions with longest available leader configuration (Hydraulic Impact Hammer HHK 5SL). Leader hinge is optional.